  • Riyadh

Rooftop solar on government buildings

  • In progress
  • Riyadh Region Municipality
  • Breakthrough innovation
  • Output: Technology

A pilot installing solar panels on the main building's roof under a power purchase agreement, ahead of extending it to other buildings if it proves worthwhile.

The structural survey of the roof is complete, and the contract is under legal review.

About this initiative

Delivered by
Sustainability Department
Started
21 Dhuʻl-Qiʻdah 1447 AH — 8 May 2026
Target delivery
25 Shaʻban 1448 AH — 2 February 2027
Budget
0 riyals

Solution profile

Solution maturity
Working model (since 5 Dhuʻl-Hijjah 1447 AH — 22 May 2026)
Idea source
Challenge

Progress

30%

Milestones count 50% and targets 50%.

Milestones
2 of 5 complete (40%)
Targets
Average achievement 20% (1 of 2 measured)
Readings
2 readings are overdue (the first was due 21/3/1448 AH — 3/9/2026).

Implementation milestones

40%
  1. Feasibility study Completed 2/1/1448 AH — 17/6/2026
  2. Structural survey of the roof Completed 1/2/1448 AH — 15/7/2026
  3. Legal review of the contract model Overdue — was due 23/2/1448 AH — 6/8/2026
  4. Tender and award Overdue — was due 24/5/1448 AH — 4/11/2026
  5. Installation and commissioning Due 5/8/1448 AH — 13/1/2027

Targets and impact

Not counted in the programme totals until the initiative is delivered. Achievement compares the latest reading with the expected value, from the baseline.

  • Riyals saved

    Standard impact measure

    Not measured yet: the achievement shows once a reading is entered.

    Baseline
    —
    Expected
    900,000 riyals
    Latest actual
    —
    Last reading
    —

    Reading overdue: it was due 28/5/1448 AH — 8/11/2026 (read every 6 months).

  • 20%
    Baseline
    0%
    Expected
    10%
    Latest actual
    2%
    Last reading
    14/9/1447 AH — 3/3/2026

    Reading overdue: it was due 21/3/1448 AH — 3/9/2026 (read every 6 months).

    Readings over time

    Readings of “Reduction in electricity use in municipal buildings” over time — the numbers
    Reading date Actual value (%) Expected value
    2026-03-03 2 10

    Output of the installed panels against consumption.

Beneficiary feedback

No feedback yet. If you use this solution, tell the team what works and what could be better.