Rooftop solar on government buildings through a partnership model

  • In implementation
  • Sustainability

Being implemented

Its initiative «Rooftop solar on government buildings» records the work (In progress). Once the initiative is delivered, mark the idea launched.

The roofs of government buildings are open, sunny all year round, and unused. Solar panels could be installed on them without capital spending by the entity, through a model in which a specialist company installs and operates them and the entity buys the electricity they produce at below the grid price.

I suggest starting with three buildings that have large, flat roofs, and measuring output for a year before expanding.

Where this idea has got to

Stage 6 of 7

Current stage: In implementation

See every stage
  1. Draft Completed
  2. Submitted Completed
  3. Ideation Completed
  4. Evaluation Completed
  5. Approved Completed
  6. In implementation Current step
  7. Launched Upcoming

What became of this idea

This idea is being delivered as an initiative:

Rooftop solar on government buildings

In progress

40%
  1. Feasibility study Completed 2/1/1448 AH — 17/6/2026
  2. Structural survey of the roof Completed 1/2/1448 AH — 15/7/2026
  3. Legal review of the contract model Overdue — was due 23/2/1448 AH — 6/8/2026
  4. Tender and award Overdue — was due 24/5/1448 AH — 4/11/2026
  5. Installation and commissioning Due 5/8/1448 AH — 13/1/2027

Discussion (4)

نموذج شراء الطاقة يحتاج مراجعة نظامية لعقود المنافسات والمشتريات الحكومية. أنصح بإشراك الإدارة القانونية مبكرًا.

يجب التحقق من قدرة الأسطح الإنشائية على تحمّل وزن الألواح قبل أي شيء.

Innovation Score

78 out of 100

Community 30% · Expert panel 70%

80%
77%

Based on 3 submitted evaluations

Community support

27 people support this
4.2 Based on 18 ratings

Sign in to support and rate this idea.

About this idea

Submitted by
عبدالرحمن السديري
Submitted on
19 Rajab 1447 AH — 8 January 2026
Category
Tags

Lifecycle history

  1. Draft (Completed)

    The platform team · 08 Jan 2026 — 16:28

  2. Submitted (Completed)

    The platform team · 08 Jan 2026 — 17:33

  3. Ideation (Completed)

    The platform team · 10 Jan 2026 — 05:48

  4. Evaluation (Completed)

    The platform team · 28 Feb 2026 — 13:24

  5. Approved (Completed)

    The platform team · 14 Mar 2026 — 11:06

  6. In implementation (Current stage)

    The platform team · 03 Apr 2026 — 12:15