Skip to main content
A government website registered with the Digital Government Authority
How you know?

Official government website links end with gov.sa

Official websites in the Kingdom use this domain — check it in the address bar before sharing your information.

Secure websites use the HTTPS protocol

Look for the lock icon or https:// in the address bar — it means your connection to the site is encrypted.

Registered with the Digital Government Authority under number:
  • Riyadh

Air conditioning scheduled by room occupancy

  • Delivered
  • Riyadh Region Municipality
  • Incremental innovation
  • Output: Process

Delivered in the Riyadh Region Municipality's main building and two annexes by connecting the building management system to the room booking system. Air conditioning starts cooling a room twenty minutes before a meeting and returns to standby once it ends.

Consumption was measured for three months before go-live and three months after, in the same season of the year: air conditioning use on the floors covered fell by 31%.

About this initiative

Delivered by
Operations and Maintenance Department
Started
25 Ramadan 1447 AH — 14 March 2026
Target delivery
8 Rabiʻ I 1448 AH — 21 August 2026
Budget
420,000 riyals

Solution profile

Solution maturity
In operation (since 25 Dhuʻl-Qiʻdah 1447 AH — 12 May 2026)
Idea source
Challenge

Progress

97%

Milestones count 50% and targets 50%.

Milestones
5 of 5 complete (100%)
Targets
Average achievement 93% (1 of 5 measured)
Next reading
14/9/1448 AH — 21/2/2027

Implementation milestones

100%
  1. Survey meeting rooms and how they are booked Completed 10/10/1447 AH — 29/3/2026
  2. Connect the building management system to bookings Completed 13/11/1447 AH — 30/4/2026
  3. Pilot on the third floor Completed 21/12/1447 AH — 7/6/2026
  4. Measure consumption before the roll-out Completed 16/1/1448 AH — 1/7/2026
  5. Roll out to the main building and annexes Completed 6/3/1448 AH — 19/8/2026

Targets and impact

Delivered: its latest readings count in the programme totals on the transparency page.

  • Riyals saved

    Standard impact measure

    Achievement: no expected value was set, so there is nothing to compare the reading with.

    Baseline
    —
    Expected
    —
    Latest actual
    1,850,000 riyals
    Last reading
    8/3/1448 AH — 21/8/2026

    Next reading due 14/9/1448 AH — 21/2/2027 (read every 6 months).

    Readings over time

    Readings of “Riyals saved” over time — the numbers
    Reading date Actual value (riyals)
    2026-08-21 1,850,000
  • Working hours saved each year

    Standard impact measure

    Achievement: no expected value was set, so there is nothing to compare the reading with.

    Baseline
    —
    Expected
    —
    Latest actual
    0 hours
    Last reading
    8/3/1448 AH — 21/8/2026

    Next reading due 14/9/1448 AH — 21/2/2027 (read every 6 months).

    Readings over time

    Readings of “Working hours saved each year” over time — the numbers
    Reading date Actual value (hours)
    2026-08-21 0
  • People benefiting

    Standard impact measure

    Achievement: no expected value was set, so there is nothing to compare the reading with.

    Baseline
    —
    Expected
    —
    Latest actual
    4,200 beneficiaries
    Last reading
    8/3/1448 AH — 21/8/2026

    Next reading due 14/9/1448 AH — 21/2/2027 (read every 6 months).

    Readings over time

    Readings of “People benefiting” over time — the numbers
    Reading date Actual value (beneficiaries)
    2026-08-21 4,200
  • 93%
    Baseline
    0%
    Expected
    15%
    Latest actual
    14%
    Last reading
    3/4/1448 AH — 14/9/2026

    Next reading due 6/10/1448 AH — 14/3/2027 (read every 6 months).

    Readings over time

    Readings of “Reduction in electricity use in municipal buildings” over time — the numbers
    Reading date Actual value (%) Expected value
    2026-03-23 6 15
    2026-06-21 11 15
    2026-09-14 14 15

    Main building meter readings.

  • Beneficiary satisfaction

    Standard impact measure

    Achievement: no expected value was set, so there is nothing to compare the reading with.

    Baseline
    —
    Expected
    —
    Latest actual
    87.5%
    Last reading
    8/5/1448 AH — 19/10/2026

    Next reading due 12/11/1448 AH — 19/4/2027 (read every 6 months).

    Readings over time

    Readings of “Beneficiary satisfaction” over time — the numbers
    Reading date Actual value (%)
    2026-10-19 87.5

Beneficiary satisfaction

This solution is in use. If you have used it, tell us how satisfied you are: one question, once.

Beneficiary feedback (4)

أعمل في المبنى الرئيسي ولم ألاحظ أي فرق في البرودة، والفاتورة انخفضت فعلًا. عمل ممتاز.
هل يمكن تطبيق الجدولة على قاعات التدريب أيضًا؟ تبقى مكيفة طوال اليوم.
القاعة الكبيرة تحتاج دقائق لتبرد بعد بدء الاجتماع. ربما يبدأ التشغيل قبل الحجز بربع ساعة؟